Yesterday, our crews installed hydraulic
jacks underneath the bridge truss and began lifting it in order to remove the temporary roller bearings used to extend the bridge across the breach. The jacks will also be used to lower the bridge onto the permanent bearings. This is a very delicate procedure where the
bridge is alternately supported on wood blocks and lowered with the jacks
approximately four to six inches at a time. Eventually, the
bridge will be lowered approximately two to five feet, depending on the location along the
bridge alignment.